Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 10 Year Warranty| Ships Worldwide to 100+ Countries| Every Part Tested & Warranted| 500,000+ Enterprise Parts| Dell · HPE · IBM · Lenovo · Cisco|Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 10 Year Warranty| Ships Worldwide to 100+ Countries| Every Part Tested & Warranted| 500,000+ Enterprise Parts| Dell · HPE · IBM · Lenovo · Cisco

Dell PowerEdge Migration Guides

ICD Professional Migration Services — end-to-end server, storage, and data center migration for enterprise customers across Egypt, GCC, MENA, the Levant, all Africa, and global markets. Generation refresh (Gen10 → Gen11, Gen14 → Gen15 → Gen16), DC consolidation, lift-and-shift, virtualization migration, cloud-to-on-premises repatriation, and physical-to-virtual conversions.

Migration Service Tiers

ICD’s migration practice operates under the ICD Professional service brand, with three engagement models:

  • Assessment-only — pre-migration health check, capacity analysis, hardware compatibility validation, dependency mapping. Item code ICD-ASSESS. Typical 1–2 weeks for a single-site engagement.
  • Install & Config — physical install, BIOS/firmware update, OS provisioning, hypervisor (VMware, Hyper-V, KVM, Proxmox), storage zoning, network VLAN/VXLAN configuration. Item code ICD-INSTALL.
  • Full Migration — discovery, planning, parallel-environment build, data migration with validation cycles, cutover, post-cutover stabilization. Item code ICD-MIGRATE.

Common Migration Scenarios

  • Dell PowerEdge G12/G13 → R750/R650 (Gen3 Ice Lake)
  • Dell PowerEdge G14 → R760/R660 (DDR5, Gen4/Gen5 Sapphire / Emerald Rapids)
  • HPE ProLiant Gen8/Gen9 → DL360/DL380 Gen11 (DDR5)
  • VMware ESXi 6.7 → 8.x with hardware refresh
  • Legacy SAN (EMC VNX, NetApp FAS legacy) → all-flash arrays
  • Physical → virtual (P2V) with VMware Converter or Veeam
  • Cloud repatriation — moving workloads back from AWS/Azure/GCP to on-premises

Methodology

ICD migrations follow a 5-phase model: (1) Discovery — inventory, dependency map, baseline performance metrics; (2) Design — target-state architecture, migration runbook, rollback plan; (3) Build — parallel target-environment provisioning; (4) Migrate — data sync, application validation, cutover window; (5) Stabilize — post-cutover monitoring, performance validation, knowledge transfer.

Pricing

Engagements scoped per project. Assessment, Install & Config, and Full migration are each quoted per project, depending on scope, scale, and on-site travel requirements. Custom SOW provided after a 30-minute discovery call.

Request migration scope with target environment description. Email [email protected].

Specific Migration Paths

Step-by-step migration guides for common server refreshes. Each guide covers parts requirements, timeline, budget estimate, and rollback plan.

HPE ProLiant Migrations

Dell PowerEdge Migrations

Frequently Asked Questions

What does an assessment-only migration engagement include and how long does it take?

The assessment-only tier covers a pre-migration health check, capacity analysis, hardware compatibility validation and dependency mapping, under item code ICD-ASSESS. A single-site engagement typically takes 1–2 weeks. Install & Config and the full tier are the two larger engagement models, each scoped per project after a 30-minute discovery call.

Which hypervisors are covered during installation and configuration work?

The Install & Config tier covers VMware, Hyper-V, KVM and Proxmox, alongside physical install, BIOS/firmware update, OS provisioning, storage zoning and network VLAN/VXLAN configuration. Common scenarios also include moving VMware ESXi 6.7 to 8.x as part of a hardware refresh, and HPE ProLiant Gen8/Gen9 to DL360/DL380 Gen11.

What are the five phases of a full data centre migration?

Migrations follow five phases: Discovery, covering inventory, dependency map and baseline metrics; Design, with target-state architecture, runbook and rollback plan; Build, provisioning the parallel target environment; Migrate, covering data sync, application validation and the cutover window; and Stabilize, with post-cutover monitoring, performance validation and knowledge transfer.

Can workloads be moved back from public cloud to on-premises hardware?

Yes, cloud repatriation, moving workloads back from AWS, Azure or GCP to on-premises, is one of the common migration scenarios. Others include physical-to-virtual conversion with VMware Converter or Veeam, and legacy SAN moves from EMC VNX or NetApp FAS legacy systems to all-flash arrays. Request a scope with a description of your target environment.

Last updated

Worldwide Shipping

Fast delivery to 100+ countries

Tested & Warranted

Every part fully tested before shipping

Enterprise Grade

Dell, HPE, Lenovo & Cisco parts

Dedicated Support

Expert team for quotes & technical help