IBM TS2250 End of Life: EOL & EOSL Dates
EOSLEnd of sale for the IBM TS2250 depends on the variant: 10 April 2018 for 3580-H5S (source: IBM product lifecycle list (CSV, ibm.com/support)). End of support depends on the variant: 31 December 2023 for 3580-H5S (source: IBM product lifecycle list (CSV, ibm.com/support)).
IBM
Lifecycle Timeline
| Milestone | Date | Basis | Source |
|---|---|---|---|
| End of Sale 3580-H5S | 10 April 2018 | Manufacturer | IBM product lifecycle list (CSV, ibm.com/support)“Columns: Type, IBM Product, VRM, PID, Licence Type, MTM, GA, GA #, EOM, EOM #, EOD, EOD #, EOS, EOS #. Row: HW,IBM TS2250 Tape Drive (3580-H5S),N/A,N/A,,3580H5S,2014-04-28,52427,2018-04-10,73609,2021-12-31,expected field value,2023-12-31,77703” |
| End of Support 3580-H5S | 31 December 2023 | Manufacturer | IBM product lifecycle list (CSV, ibm.com/support)“Columns: Type, IBM Product, VRM, PID, Licence Type, MTM, GA, GA #, EOM, EOM #, EOD, EOD #, EOS, EOS #. Row: HW,IBM TS2250 Tape Drive (3580-H5S),N/A,N/A,,3580H5S,2014-04-28,52427,2018-04-10,73609,2021-12-31,expected field value,2023-12-31,77703” |
| Lifecycle Status | EOSL |
Checked on 21 November 2026. Each date names who published it; ICD does not print a date no source has published.
IBM TS2250 Parts and Support Options
Here are your options:
- ICD Care+ (TPM) — Save 40-60% vs OEM contracts
- Browse 0 Listed Parts
- ICD Parts+ (SPaaS) — Spare parts on demand
- Hardware Buyback — Retire and get value back
Need Parts for Your IBM TS2250?
0 parts listed by component family. Quote within 24 hours. Ships worldwide.
Browse Listed Parts Request a QuoteFrequently Asked Questions
Is the IBM TS2250 end of life?
It depends on the variant. End of sale for the IBM TS2250 depends on the variant: 10 April 2018 for 3580-H5S (source: IBM product lifecycle list (CSV, ibm.com/support)). End of support depends on the variant: 31 December 2023 for 3580-H5S (source: IBM product lifecycle list (CSV, ibm.com/support)).
When does the IBM TS2250 reach end of life?
End of sale for the IBM TS2250 depends on the variant: 10 April 2018 for 3580-H5S (source: IBM product lifecycle list (CSV, ibm.com/support)). End of support depends on the variant: 31 December 2023 for 3580-H5S (source: IBM product lifecycle list (CSV, ibm.com/support)).
How do I check support status for my IBM TS2250?
Check it unit by unit: enter the serial number of your IBM TS2250 in IBM's warranty or support lookup to see when its cover ends. Cover follows each unit's own warranty and contracts, so it can differ from the model-level dates on this page.
Can I keep running the IBM TS2250 after end of support?
Yes. The hardware keeps working after the manufacturer's support ends; what stops is the manufacturer's own repair and contract cover. ICD Care+ third-party maintenance takes over that cover.
Can I still buy parts for the IBM TS2250?
Yes. For the IBM TS2250, ICD has 0 parts listed by component family; part-level fit is confirmed on every quote. Ships worldwide from Cairo, Egypt.
What support options exist after IBM TS2250 end of support?
ICD offers Third-Party Maintenance (ICD Care+) at 40-60% less than OEM contracts, plus Spare Parts as a Service (ICD Parts+) for on-demand part availability with parts delivery from Next Business Day (Silver) to 2-Hour emergency (Platinum).
