HPE Support in France After End of Life
ICD supplies tested HPE Synergy, ProLiant and MSA components into France in 3 to 5 days from Cairo, including the management hardware a composable estate cannot operate without.
HPE Hardware We Keep Running in France
Synergy, ProLiant and MSA components, including the appliance that composes the whole estate.
Management appliance hardware and the components keeping an existing one alive
Synergy FramesFrame link modules, interconnects and the components that join frames
Compute ModulesSynergy compute modules across the generations in service
ProLiant ServersDL and ML machines alongside the composable estate
MSA and StorageArray controllers, enclosures and drives behind those workloads
Frame PowerFrame power supplies and the fan modules the enclosure requires
Latest HPE Parts
Genuine components shipped worldwide — request a live quote on any part.
- P81130-B21 HPE DL380 Gen12 GPU Cooling Upgrade Enablement Kit
- 863442-B21 HPE ProLiant BL460c Gen10 10Gb/20Gb FLB CTO Blade Server
- P11742-001 HPE DL560/DL580 Gen10 CLX CPU Mezzanine Board 2x LGA3647 24x DDR4
- P11741-001 HPE DL560/DL580 Gen10 CLX System I/O Board Motherboard
- P05913-001 HPE NVIDIA Tesla V100 PCIe 32GB HBM2 GPU Accelerator
- P39384-001 HPE 1600W Flex Slot Platinum Hot Plug 12V Power Supply
- 751465-B21 HPE Virtual Connect 16Gb 24-Port Fibre Channel Module for c-Class BladeSystem
- JL682A HPE Aruba Instant On 1930 24G 4SFP/SFP+ Switch
- P60537-B21 HPE Cray XD670 CTO 5U 8-GPU NVIDIA HGX H200 SXM5 Server
- P69729-F21 HPE 96GB RDIMM DDR5-6400 PC5-51200R ECC Memory
- P74704-B21 HPE ProLiant Compute DL380a Gen12 4EDSFF Direct Attach Cable Kit
- P74712-B21 HPE ProLiant Compute DL380a Gen12 4EDSFF FIO Drive Cage Kit
Your Trusted Server Parts Partner
Why IT teams choose ICD for their server infrastructure needs.
100% Genuine Parts
Every component is sourced from verified suppliers in the US and Europe and carries its original OEM part number. No counterfeits, no compromises.
Sourced Per Order, Ships Fast
Every part sourced, tested and shipped from Cairo, with the dispatch window confirmed in each quote and worldwide delivery.
Expert Compatibility
Our team verifies every part matches your exact server model before shipping. No guesswork, no returns.
Competitive Pricing
Direct sourcing from enterprise channels means better pricing than OEM direct. Volume discounts available for data centers.
MENA, Africa & Worldwide
Serving enterprises across MENA, GCC, Levant, Africa, and worldwide. From Cairo to Dubai, Riyadh to Nairobi — we deliver everywhere.
Warranty Protected
All parts backed by warranty coverage. We stand behind every component we sell with responsive support.
What Happens to Your Synergy Estate If the Composer Fails?
Get a quote within 24 hours. Our team is ready to help you find the exact components for your server infrastructure.
Frequently Asked Questions
HPE Synergy Composer, frame and delivery questions for operators in France.
Composability Lives in One Appliance
Synergy exists to be composed: profiles applied to compute modules, storage attached, networking defined, all from a management appliance. That capability is the reason the platform was chosen, and all of it resides in the Composer. The frames and modules are hardware; the system is the appliance.
Losing It Freezes Rather Than Stops
Compute modules continue running whatever they were last composed as, indefinitely and reliably. What disappears is every change: no profile can be created, altered or reapplied, and no failed module can be recomposed onto a spare. The estate is fully operational and completely rigid, which is comfortable until the first event that requires a change.
Redundant by Design, Single in Practice
The appliance can be deployed as a redundant pair, and on a great many estates it was not, because one was sufficient at installation and the decision was never revisited. The design documentation describes a resilient management plane; the rack frequently contains one appliance. Which of those you have is worth establishing before it matters.
Keeping the One You Have Beats Rebuilding
Holding components that keep the existing Composer alive is substantially more practical than reconstructing one for a generation past end of support. Beyond that, frame link modules and frame power supplies are the components that reach every module in a frame. ICD ships these to France in 3 to 5 days, tested and covered for one to three years.
