Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 3 Year Warranty as Standard| Ships Worldwide to 100+ Countries| Every Part Fully Tested & Certified| 500,000+ Enterprise Parts In Stock| Dell · HPE · IBM · Lenovo · Cisco|Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 3 Year Warranty as Standard| Ships Worldwide to 100+ Countries| Every Part Fully Tested & Certified| 500,000+ Enterprise Parts In Stock| Dell · HPE · IBM · Lenovo · Cisco

HPE Cray XD665 Upgrade Guide

Maximize the performance and lifespan of your HPE Cray XD665 (Gen11). Every upgrade option below is verified compatible.

7Upgrade Categories
7,967Options Available

Verified Specifications

Processor Options2x 4th Gen AMD EPYC 9004 'Genoa' (options 9174F 16C to 9654 96C, 200-360W); 4U chassis node
Memory Configuration24x DIMM slots (12 per CPU, 6 channels x 2 DPC), DDR5-4800 RDIMM (64GB 1Rx4 / 128GB 3DS options); minimum system memory 1,024 GB; up to 1.5TB per processor
Drive ConfigurationsUp to 8x SFF NVMe U.3 SSD (960GB-7.68TB RI/MU) + 2x M.2 22110 960GB PCIe Gen4 SSD (Samsung PM9A3)
Power Supply Options6x 3,000W hot-plug power supplies per system (full N+N redundancy; Titanium or Platinum Apollo 6500 Gen10 Plus modular kits); 12x system fans; air or DLC radiator cooling kit
RAID ControllersM.2 RAID controller (max 1) with HPE RAID 0/1 FIO settings; SFF NVMe RAID 5/ADG options with CVPM05 super-cap for >4 drives
Networking Options5x PCIe Gen5 x16 HHHL slots for high-speed fabric: HPE Slingshot 200Gb, NVIDIA InfiniBand NDR/NDR200 OSFP (MCX75310AAS-NEAT/-HEAT), HDR QSFP56 (MCX653105A-HDAT); OCP3 adapter; dedicated HPE Cray XD management network port
GPU Options4x NVIDIA H100 80GB SXM5 Tensor Core GPUs (FIO accelerator P63395-B21); PCIe GPUs not supported
Specification SourceHPE official documentation (verified 2026-07-02)

Upgrade Storage

Moving from spinning disk to SSD or NVMe storage provides the largest single performance improvement — often 10-50x faster I/O. Consider NVMe for boot drives and high-IOPS workloads.

View all 5,336 storage options →

Upgrade Networking

Stepping up from 1GbE to 10GbE or 25GbE eliminates network bottlenecks for VM migration, iSCSI storage traffic, and backup windows. Most modern workloads benefit from at least 10GbE.

View all 335 networking options →

Upgrade Power & Cooling

This category provides verified compatible upgrade paths. ICD engineers validate every part for compatibility with your specific server model and workload requirements.

View all 512 power & cooling options →

Upgrade GPU

This category provides verified compatible upgrade paths. ICD engineers validate every part for compatibility with your specific server model and workload requirements.

View all 275 gpu options →

Upgrade Controllers

Upgrading your RAID controller enables faster disk I/O, larger cache, and support for newer drive technologies. Essential when adding NVMe or SAS-4 drives.

View all 432 controllers options →

Upgrade Memory

Memory is the most impactful upgrade for virtualization and database workloads. Upgrading from 64GB to 128GB or 256GB can dramatically improve VM density and application response times.

View all 134 memory options →

Upgrade Processors

CPU upgrades deliver more cores and higher clock speeds. If your workload is CPU-bound (compilation, analytics, HPC), upgrading from 8-core to 16+ core processors provides significant throughput improvement.

View all 943 processors options →

Ready to upgrade your HPE Cray XD665?

Tell us your current configuration and workload. Our engineers will recommend the most impactful upgrades with guaranteed compatibility.

Get Upgrade Quote
Worldwide Shipping

Fast delivery to 100+ countries

Tested & Certified

Every part fully tested before shipping

Enterprise Grade

Dell, HPE, Lenovo & Cisco parts

Dedicated Support

Expert team for quotes & technical help