Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 10 Year Warranty| Ships Worldwide to 100+ Countries| Every Part Tested & Warranted| 500,000+ Enterprise Parts| Dell · HPE · IBM · Lenovo · Cisco|Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 10 Year Warranty| Ships Worldwide to 100+ Countries| Every Part Tested & Warranted| 500,000+ Enterprise Parts| Dell · HPE · IBM · Lenovo · Cisco

Dell PowerEdge C6520 vs C6620 | HPC Density Sled Comparison

Dell PowerEdge C6520 vs C6620 — Density Compute and HPC Sleds

The C-series is Dell’s density compute line — four 2-socket sleds in a 2U chassis (C6400 for 15G, C6600 for 16G). The target customer is HPC, CDN, large-scale web infrastructure, and hyperscale-style workloads where compute-per-rack-U is the metric that matters. This guide covers the C6520 (15G, Ice Lake) versus the C6620 (16G, Sapphire/Emerald Rapids).

Density by design

C6520 sled + C6400 chassisC6620 sled + C6600 chassis
Generation15G16G
ReleasedMarch 2021January 2023
Chassis size2U (C6400)2U (C6600)
Sleds per chassis44
Sockets per sled22
Sockets per 2U88
CPUXeon Scalable Gen 3 (Ice Lake-SP)Xeon Scalable Gen 4/5 (Sapphire / Emerald Rapids)
Max cores per sled80 (dual 40-core)128 (dual 64-core)
Max cores per 2U chassis320512
DIMM slots per sled1616
Memory per sled2TB DDR44TB DDR5
Drive bays per sled6 SFF / 3 LFF4 SFF (SAS/SATA/NVMe) or 2 E3.S NVMe
PCIeGen 4Gen 5
Chassis PSU2 × 1600W, 2000W, 2400W or 2600W2 × 1800W, 2400W, 2800W or 3200W
OEM supportNo fixed date published by Dell (support per service tag)Active

Density economics

The C-series is purchased by customers optimising for cores-per-U and dollars-per-core at scale. In one 2U chassis:

  • C6520 (full populate): 8 sockets × 40 cores = 320 cores, 8TB RAM, 24 drive bays.
  • C6620 (full populate): 8 sockets × 64 cores = 512 cores, 16TB RAM, 16 SFF or 8 E3.S NVMe drive bays.

Contrast with stacking 4 × R650 (15G) in 4U: same core count but 2× the rack space. Or 4 × R660 (16G) — 4U to match the C6620’s 2U. Rack rent, power distribution, and cooling all favour C-series density at scale.

Where C-series is the wrong answer

  • Mixed workload — the sleds are less flexible per-host than rack servers. Fewer PCIe slots, limited local storage, no GPU.
  • Small deploys under 4 sleds — you are paying for chassis you don’t fill.
  • Regulated enterprises that want per-host physical separation — sleds share chassis PSU and fabric.
  • Any GPU attachment — C-series is CPU-density first, GPU support is minimal.

Memory gap

C6520: DDR4-3200 RDIMM, 16 DIMMs per sled, 2TB ceiling. PN samples: 6VDNY, 74FPM, 75X1V, HF6GX.

C6620: DDR5-4800/5600 RDIMM, 16 DIMMs per sled, 4TB ceiling. PN samples: AC239377, AC239378, AC239379, AC448843.

The DDR5 bandwidth jump matters for HPC codes that live in memory — finite-element simulations, genomics pipelines, large-scale CFD.

Storage — the real architectural shift

C6520 sleds ship with 6 × SFF or 3 × LFF local drives. SAS or SATA, with NVMe available on a subset of SKUs via direct-attach. Use case: OS boot + scratch space + local cache. Primary storage lives on external SAN / parallel filesystem.

C6620 sleds take up to 4 × SFF (SAS, SATA or NVMe) or 2 × E3.S NVMe. Local-NVMe-first is the new model. For Lustre or BeeGFS deployments where each node contributes local-NVMe to a distributed namespace, C6620 is a meaningful capability jump.

Representative NVMe PNs: 0D4GH, 0MNMV. E3.S: 1VK3C, 831H5, G27W5.

Power distribution

C6400 chassis takes 2 shared PSUs of 1600W, 2000W, 2400W or 2600W. C6600 takes 2 shared PSUs of 1800W, 2400W, 2800W or 3200W. Redundancy is at chassis level, not per-sled — a failed PSU affects all 4 sleds’ power delivery margin. For most HPC customers this is acceptable; for critical commercial workloads, rack is the safer choice.

Networking

C-series typically ships with high-density 25/100 GbE OCP NIC 3.0 mezzanines per sled. InfiniBand / Omni-Path options exist for HPC customers needing low-latency fabric. C6620 supports PCIe 5.0 NICs — 400 GbE single-port or 2 × 200 GbE become realistic for the first time in this form factor.

Procurement realities

C-series is lower-volume than rack — both new and refurb channels are thinner. Chassis + sled pairing matters: a bare C6620 sled without the C6600 chassis is inert. ICD supplies both chassis types from Cairo for GCC and North Africa HPC customers, with the lead time stated on each quote for full 4-sled configurations.

Decision framework

  • HPC cluster, greenfield, 32+ nodes → C6620. DDR5 + PCIe 5.0 + local NVMe pays back immediately.
  • HPC cluster, scale-out of existing C6520 fleet → C6520 (keep fleet consistent) until a full refresh cycle.
  • Hyperscale-style web/CDN at 100+ nodes → C6620 for density efficiency.
  • Anything mixed-workload or under 4 nodes → skip C-series, use R660/R760.

For HPC / density-compute quotes, submit RFQ with node count, CPU SKU target, and interconnect. ICD typically responds within 24 hours with C-series pricing.

Frequently Asked Questions

How many cores fit in one 2U chassis with C6520 versus C6620 sleds?

A fully populated C6400 chassis with four C6520 sleds reaches 320 cores, from 8 sockets of 40 cores, with 8TB of RAM. A C6600 chassis with four C6620 sleds reaches 512 cores, from 8 sockets of 64 cores, with 16TB of RAM and up to 16 SFF or 8 E3.S NVMe drive bays.

Can a C6620 sled run on its own without the chassis?

No. A bare C6620 sled without the C6600 chassis is inert, so chassis and sled pairing matters when buying. The C6520 sled likewise pairs with the C6400 chassis. Both chassis types are supplied from Cairo for GCC and North Africa HPC customers, with lead time stated on each quote.

When is a density sled the wrong choice compared with a rack server?

Skip the C-series for mixed workloads, deployments under 4 sleds, regulated sites that need per-host physical separation, or any GPU attachment. Sleds have fewer PCIe slots, limited local storage and share chassis PSU and fabric. For those cases the R660 or R760 rack servers are the suggested route.

What happens to all four sleds if one chassis power supply fails?

Power redundancy sits at chassis level, not per sled, so a failed PSU affects the power delivery headroom of all four sleds. The C6400 takes two shared units of 1600W, 2000W, 2400W or 2600W and the C6600 takes two shared units of 1800W, 2400W, 2800W or 3200W. Most HPC users accept this; for critical commercial workloads a rack server is safer.

Last updated

Worldwide Shipping

Fast delivery to 100+ countries

Tested & Warranted

Every part fully tested before shipping

Enterprise Grade

Dell, HPE, Lenovo & Cisco parts

Dedicated Support

Expert team for quotes & technical help