Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 3 Year Warranty as Standard| Ships Worldwide to 100+ Countries| Every Part Fully Tested & Certified| 500,000+ Enterprise Parts In Stock| Dell · HPE · IBM · Lenovo · Cisco|Trusted Since 2005| +202 2705 2005| [email protected]| 1 to 3 Year Warranty as Standard| Ships Worldwide to 100+ Countries| Every Part Fully Tested & Certified| 500,000+ Enterprise Parts In Stock| Dell · HPE · IBM · Lenovo · Cisco

Cisco RAID Controllers Nigeria | Cisco UCS Compatible

Cisco RAID Controllers in Nigeria — UCS Spares for Lagos, Abuja, Port Harcourt

ICD Group supplies Cisco UCS RAID controllers and HBAs to Nigerian Tier-1 banks, telcos, fintechs, and NNPC-adjacent operators via Cairo-to-Lagos air freight. The installed Cisco UCS footprint in Nigeria leans hard on C220/C240 M5 and M6 inside Zenith, GTCO, Access, UBA, First Bank, and the MTN / Airtel infrastructure estate — a lot of that fleet was deployed 2017-2020, is now post-SmartNet or approaching EOSL, and faces a near-impossible renewal math after the 2023 NGN forex unification doubled the effective cost of any USD-invoiced OEM contract. Our specialty UCS inventory is sized around that exact pain, not broad volume.

Regulatory note: NCC (Nigerian Communications Commission) Type-Approval applies to telecom equipment — routers, switches with RF, modems, wireless APs. Cisco UCS rack server RAID controllers and HBAs is not NCC-regulated. SON / SONCAP certification applies to the general IT hardware import; our Lagos IOR partner carries active SONCAP coverage for server spares under HS 8471.50 / 8471.70 / 8473.30. NCS (Nigeria Customs Service) handles duty at 5% on ICT equipment; VAT is 7.5% FIRS. Form M documentation through the importer’s CBN-licensed bank is required for official FX allocation on any order above threshold.

Representative Cisco UCS RAID Controllers PNs in ICD Inventory

Cisco Part NumberDescription
UCS-M10CBL-C240M5Cisco GPU Power Cable (a-series Gpus, C240 M7)
UCS-M2-HWRAID-DCisco M.2 SATA RAID Controller (boot Optimized, 2X M.2 Slots)
UCS-M2-NVRAIDCisco M.2 NVMe RAID Controller (boot Optimized)
UCS-SCAP-DCisco Supercap Module for RAID WRITE-CACHE Backup
UCS-SCAP-M6Cisco Supercap Module for M6 RAID Controllers (write Cache Backup)

Full UCS raid controllers list covers 42 Cisco-prefixed part numbers. This is a focused specialty inventory — send your UCS part request and we return an exact availability, cross-reference, and compatibility confirmation within the business day.

Cisco UCS Server Models We Support

Per-model parts guides for the UCS generations most common in the region:

  • UCS C245 M6 — 2U rack, AMD EPYC Milan, GPU-ready
  • UCS C220 M5 — 1U, Xeon Scalable Gen1/2, primary refurb target
  • UCS C240 M5 — 2U, Xeon Gen1/2, Egypt/GCC banking-backbone generation
  • UCS C480 M5 — 4U, 4-socket, mission-critical
  • UCS C220 M4 — 1U, Xeon E5 v3/v4, EOSL, TPM-only support
  • UCS C240 M4 — 2U, Xeon E5 v3/v4, EOSL, ICD Care+ territory
  • UCS B200 M5 — B-series blade, chassis 5108
  • UCS C220 M7 — 1U rack, Xeon Scalable Gen4/5, DDR5 4800/5600
  • UCS C240 M7 — 2U rack, Xeon Scalable Gen4/5, 24x DIMM, 24x SFF
  • UCS C220 M8 — 1U rack, Xeon 6 (Granite Rapids), DDR5 6400

Technical Anchor: 12G SAS HBA (LSI-based) M5 vs M6 Firmware Tie

The UCS-SAS-M5HD (12G Modular SAS HBA, max 26 drives) and UCSC-SAS-M5 / UCSC-MRAID12G family on M5 are Broadcom / LSI silicon under Cisco firmware. The UCSC-RAID-M6HD, UCSC-RAID-220M6, UCSC-RAID-240M6, UCSC-SAS-220M6, UCSC-SAS-240M6 M6 line is the next Broadcom generation but Cisco firmware is deliberately not cross-compatible — UCSM / Intersight will recognize a physical M5 card plugged into an M6 system, but the management stack will refuse RAID policy push and the card logs as unsupported_in_platform. This trips up customers trying to migrate spare HBAs across generations. M6 Tri-Mode options (UCSC-RAID-M6T, UCSC-SAS-M6T, UCSC-RAID-M5-24G) add SAS/SATA/NVMe passthrough, and the M7/M8 line (UCSC-HBA-M1L16, UCSC-RAID-M1L16) is 24G Tri-Mode. Write-cache supercap modules (UCS-SCAP-D, UCS-SCAP-M6, UCSC-MRAID-SC) are generation-locked too. We stock the generation-matching supercap and RAID card for every current quote, plus the M2 boot-RAID options (UCS-M2-HWRAID-D SATA, UCS-M2-NVRAID NVMe) that have become standard in post-2022 UCS orders.

Lagos, Abuja — Shipping, FX, and Bank-Grade SLAs

Cairo CAI to Lagos LOS runs 4-6 business days via DHL Express, 5-7 via FedEx, 6-8 via Aramex. Primary clearance is at Murtala Muhammed Cargo Terminal Lagos; Abuja ABV is the secondary gateway. Port Harcourt is accessible for oil-and-gas deliveries. For bank deployments in Victoria Island / Lagos Island — especially core banking Finacle or T24 environments that cannot tolerate extended UCS parts downtime — we pre-stage Cisco UCS raid controllers spares at the Lagos IOR warehouse to compress the parts-SLA to next-business-day for critical SKUs.

Payment in NGN is unstable: ICD strongly prefers USD wire transfer (SWIFT) on Form-M-backed imports, and domiciliary USD accounts are standard for Tier-1 banks and larger fintechs (Flutterwave, Moniepoint, Opay, Paystack). LC is normal for deals above USD 100K with Zenith / GTCO / Access / Stanbic IBTC. 50/50 split (50% advance, 50% on delivery) is common for newer accounts. ICD Care+ post-SmartNet contracts quoted in USD with optional NGN-fixed annual pricing — particularly valued by banks watching OEM renewal quotes climb ~60-70% in naira terms since the 2023 forex shift.

ICD Care+ Post-SmartNet in Nigeria

Lagos pre-staged spares for Tier-1 bank core-banking UCS fleets, Abuja gateway for federal / NITDA-adjacent customers. ICD Care+ quoted USD with optional NGN-fixed annual (high-value option given the 2023+ NGN forex environment). Typically 45-60% below Cisco SmartNet renewal in USD. Bank-grade 4-hour SLA available in Lagos mainland / Victoria Island; next-business-day Abuja and Port Harcourt.

Request a Quote — Cisco UCS RAID Controllers for Nigeria

Lagos / Abuja / Port Harcourt: [email protected] or WhatsApp +20 104 022 22 14. For bank and fintech orders requiring Form M + LC documentation, we align payment instructions before shipment. 2-4 hour quote turnaround.

Worldwide Shipping

Fast delivery to 100+ countries

Tested & Certified

Every part fully tested before shipping

Enterprise Grade

Dell, HPE, Lenovo & Cisco parts

Dedicated Support

Expert team for quotes & technical help